(Going with P Plate system for unsupervised/partially supervised tool usage, as assessed by experienced woodworker) buddy system for supervision - how to arrange?
double-check first aid - ensure tourniquets especially
decommission the table saw - inherently unsafe, needs one with modern safety features
(is the old one still present?) decommission the drill press as electrically unsafe
(blocked by landlord) clearing the fire access
(Avi, Steph to set up tag holder) red/yellow/green tagging for equipment in the workshop
(Done by Jaimyn and Garry?) ownership tagging for any non-BMS equipment in the workshop
(In progress) write mandatory general induction for workshop - then inductions on individual tools
put up DR ABCD first aid chart and cut/crush charts in particular
(Avi to print and place) put up general warning signage
think about setting up St Johns 6 monthly visit to ensure first aid is filled up - or task for BMS staff to audit
Needs repair/installation
(DONE - new fans installed ) better fans/wall sealing to extract dust
band saw (making thumping sound)
(replaced with new one, has old one been disposed of?) drill press (red ticket) - needs disposal, as it's buzzing presumably due to arcing!
(Steph arranging handover from Riley) woodworking table to be finished and installed
(Optional, Jaimyn to arrange) daisy-chained tool power supplies to be fixed
Process documentation
(DONE - Steph now has access) Moodle access needed - finish wiki tool documentation - particularly for drill press, band saw, and drop saw
for someone other than Jaimyn and Emily
(Steph to do, Emily if available) inductions that exist already on Moodle - need double check for existence, and expert eye over (CC for competency check, Quality Check by expert, SI for safety info, MM for more material) - also consider adding hazard symbols like 3D printers
#2 band saw (has videos, needs SI, CC, QC, look at Hitchin Hackspace's Bandsaw or Scroll Saw pages for material)